OneStopFAQs.com - World's Largest Collection of Frequently Asked Questions - FAQs
Start Your Own website Now
GET FREE JOBS NEWSLETTER
3,67,839 [96,218 + 2,71,621] MEMBERS!


 Free Biophoto Magazine  


Free Biophoto Magazine


 Common FAQs  
 Our Services  
FAQs ARTS AND ENTERTAINMENT ARCHITECTURE DETAILS
A D V E R T I S E M E N T

Question :
Why use Hodges & Hodges Architects instead of another firm?
Category Architecture Interview Questions
Rating (0.2) By 390 users
Added on 2/1/2008
Views 3617
Rate it!
Answers:

Customer service is the best short answer.

* We give a great deal of attention to making sure that we communicate well with the client. We listen closely to the client, and make his or her wishes and goals for the project our own.
* Our fees are competitive.
* Our firm is small, so you always have the close attention from one of the firm's principals, Don or Lucy Hodges.
* We have many years of experience in a variety of project types, and can deliver sound and accurate plans and specifications.
* We have a substantial list of satisfied customers, and can offer a referral list on request.

Q9. How long will it take to complete my plans and get a Building Permit, and how long will it take to build my project?
A9. Naturally, the time required to complete a project depends on the complexity of the project, and on the number of specialty consultants that need to be involved. It is also somewhat dependent on the quality of information that the owner provides.

If a survey and geotechnical investigation is likely to be needed, the owner is well advised to obtain those documents and reports well in advance of the start of design, since scheduling the field work and obtaining the final results for those disciplines can take many weeks or months.

The legal description of the property and an assessor's parcel map will be needed to complete the plans. Often these documents are included in the Title Report in the closing documents from the time of purchase of the property. If these documents can be provided by the owner, it will save time and money on the architectural fees, since the architect firm's staff will not need visit public archives to find and copy these items.

If the project is a remodeling, it is highly desirable for the owner to obtain existing plans if available, even at some cost of time and money. This will save in the long run.

Preparing the design fee proposal, owner's review and negotiation of the fee, and contract preparation and signature usually takes at least a couple of weeks to several weeks.

The first phase of the architect's work is Research and Existing Conditions Documentation. If plans of the existing structure do not exist, or can not be located, field measuring and investigation, and preparation of existing site and building plans and elevations must be completed prior to beginning any design work. This task can take two or more weeks to complete, and naturally there is cost involved in the effort. Building Departments always require documentation of existing conditions as part of the permit process, so creation of existing plans can not be avoided. Also, in this phase, the architect researches the code constraints affecting the subject property.

Preliminary Design is highly dependent on the size and complexity of the project. In addition to the time the architect spends on design, the owner will need to spend some time reviewing the design to reach a level of comfort before proceeding to the next phase. Preliminary Design and review can take from a few weeks to a few months, but it is a vital step for following phases. While in the Preliminary Design phase, most of the work is done by the architect alone with only minor involvement of the other consultants. In subsequent phases, other engineering disciplines perform their work, so the consequence of any changes becomes far more significant (costly.) Therefore, it is vital to complete as many design decisions as possible in the Preliminary Design phase prior to continuing with Design Development and Construction Documents.

Projects with complex structural, mechanical, electrical, or specialty systems such as laboratories require a Design Development Phase. In this phase, the various consulting engineers begin their design work with the goal of coordinating loads, placement, clearances, and other interfaces between the building and its subsystems. During this phase, the Construction Documents are started and brought to about 35% completion. Smaller projects and residential remodeling do not require this phase, which can take some weeks or months for larger projects.
Construction Documents are final plans and specifications sufficiently detailed to obtain a Building Permit, obtain competitive bids from contractors, and to construct the improvements. Even the smallest projects usually require the services of a structural engineer and a California Title 24 Energy Conservation documentation specialist. More complex projects may require the services of a mechanical engineer, an electrical engineer, a civil engineer, a landscape architect, or other building and site design specialists. This phase can take from six to eight week to several months, again depending on the scope and complexity of the project.

Building Department Permit Processing is a highly variable phase. Naturally, it can not begin until Construction Documents are completed. The time of processing depends on the backlog of work at the governing municipality. Simple remodeling plans not requiring a discretionary permit usually take six to eight weeks or so at the City of San Diego. Smaller building departments, such as Encinitas and El Cajon are somewhat faster in reviewing plans. More complex and larger projects currently take two to three months or more in the City of San Diego.

The Bidding Phase can be as short as two to three weeks for small remodelings, to four or five weeks for larger projects. In any case, it is best to not start the bidding process until at least the first round of Building Department plan check is completed. If the bidding process began earlier, changes due to Building Department plan check corrections could invalidate bids, or possibly lead to extensive change orders prior to beginning construction, not a desirable outcome.
Construction Duration is obviously very dependent on the scope of the project. However, very few projects are completed in less than three months, and only the largest and most complex projects take more than nine months to a year complete. The average project falls somewhere in the middle.

Discretionary Permits are often required even for relatively small projects. Increasingly, municipalities are asking for Neighborhood Development Permits, Variances, Steep Hillsides review, and other permits that require public notice and hearings. Coastal Development Permits are sometimes required in the coastal zone. Public noticing and hearing processes take a minimum of three months to nine months or more. During the Research and Existing Conditions Documentation phase, the need for any required Discretionary Permits should surface. Although, sometimes a Discretionary Permit becomes necessary during the Preliminary Design Phase through the owners wish to maximize his/her use of the property despite adverse zoning requirements.

Q10. If I am remodeling my home, can I continue to live in it during construction?
A10. If the area to be remodeled can be readily isolated from the main living areas of the home, the answer is usually "yes." However, if kitchens and bathrooms or major living areas will be impacted, the answer is typically "not advisable." Different families have different tolerance levels for the inconvenience, dust, noise, stored materials, parking, and other annoyances that are an integral part of construction. If other living arrangements can be readily made through family, close friends, or even a rental, it may be advisable to find another place to live, especially if children and/or pets are part of the family. There is also some level of danger inherent in stored materials, moving loads, and partially completed construction that is good to avoid if feasible.



If you have the better answer, then send it to us. We will display your answer after the approval.
Rules to Post Answers in OneStopFAQs.com:-

  • There should not be any Spelling Mistakes.
  • There should not be any Gramatical Errors.
  • Answers must not contain any bad words.
  • Answers should not be the repeat of same answer, already approved.
  • Answer should be complete in itself.
  • Name :*
    Email Id :*
    Answer :*
    Verification Code Code Image - Please contact webmaster if you have problems seeing this image code Not readable? Load New Code
    Process Verification  Enter the above shown code:*
    Inform me about updated answers to this question

       
    Related Questions
    View Answer
    Why not use a Design/Build firm with an in-house design team?
    View Answer
    How does the title AIA differ from being an architect?
    View Answer
    What is the first step if I want to consider using an architect?
    View Answer
    How does an architect charge for services?
    View Answer
    Why should I hire an architect instead of just having a contractor build my remodeling?
    View Answer
    How are architects trained, and who licenses them?
    View Answer
    What do architects do?
    View Answer
    How does one become a professional home designer?
    View Answer
    What can I do with a major in architecture?
    View Answer
    To be an architect, what subjects should I take in high school?
    View Answer

    Please Note: We keep on updating better answers to this site. Subscribe to our newsletter to get notified when better answer is posted.

    Notify me when better answer is posted!
    Email:

    View ALL Architecture Interview Questions

    click here

    User Options
    Sponsored Links

    Latest 10 Questions
    i love this india
    what do you mean by kayarian?
    what is the meaning of accounting is never an exact sience
    I am having fatty liver since 2003. I gave up alcohol on 2003 on doctor advice. Now I am drinking from past six months. kindly suggest any medicine for my liver if I am continuing alcohol.
    I am having fatty liver since 2003. I gave up alcohol on 2003 on doctor advice. Now I am drinking from past six months. kindly suggest any medicine for my liver if I am continuing alcohol.
    Who do you think will win the IPL 2011?
    Who do you think will win the IPL 2011?
    Where can I find software/hardware compatible with Windows Server 2003?
    Why do cats sleep so much?
    What are the Windows Server 2003 upgrade paths?

    Google Search

    Google
    Business FAQs, Internet FAQs, Accounts FAQs, Computer FAQs, Insurance FAQs, Frequently Asked Questions & Related Pages


    Arts and Entertainment Frequently Asked Questions | Business Frequently Asked Questions | Marketing Frequently Asked Questions | Computers Frequently Asked Questions | Programming Languages Frequently Asked Questions | Education Frequently Asked Questions | Electronic gadgets Frequently Asked Questions | Health Frequently Asked Questions | People and Relationships Frequently Asked Questions | Food and Cooking Frequently Asked Questions | History Politics and Society Frequently Asked Questions | Home, Farm and Garden Frequently Asked Questions | Insurance Frequently Asked Questions | Jobs & Careers Frequently Asked Questions | Law and Legal Issues Frequently Asked Questions | Money and Credit Frequently Asked Questions | Science and Technology Frequently Asked Questions | Religion and Spirituality Frequently Asked Questions | Shopping Frequently Asked Questions | Sports Frequently Asked Questions | Travels Frequently Asked Questions | Animal Life Frequently Asked Questions | Literature and Language Frequently Asked Questions | Vehicles Frequently Asked Questions | Plants and Trees Frequently Asked Questions | Miscellaneous Frequently Asked Questions | Software Testing Frequently Asked Questions | Certification Frequently Asked Questions | Web Hosting Frequently Asked Questions | SAP Module Frequently Asked Questions | Database Frequently Asked Questions | Operating System Frequently Asked Questions | Soft Skills Frequently Asked Questions | Mainframe Frequently Asked Questions | Hobbies and Collectibles Frequently Asked Questions | Humour and Amusement Corner Frequently Asked Questions | Community life and Leisure Frequently Asked Questions | Street Care and Cleaning Frequently Asked Questions | Technology Frequently Asked Questions | India Information Frequently Asked Questions | Diseases Frequently Asked Questions | Microsoft Frequently Asked Questions | Multimedia Frequently Asked Questions | Microsoft Dotnet Frequently Asked Questions | Web Frequently Asked Questions | J2EE Frequently Asked Questions | Errors Frequently Asked Questions | Servers Frequently Asked Questions | Hardware Frequently Asked Questions | Call Center Frequently Asked Questions | Networking Frequently Asked Questions | Softwares Frequently Asked Questions | Protocols Frequently Asked Questions | Utilities Frequently Asked Questions | Graduates Frequently Asked Questions |
    Copyright © 2005-2012. One Stop FAQs.com. All rights reserved Privacy Policy | Terms and Conditions | About Us
    Our Portals : Academic Tutorials | Best eBooksworld | Beyond Stats | City Details | Cool Interview | Discussions World | Excellent Mobiles | Free Bangalore | Give Me The Code | Gog Logo | Indian Free Ads | Freshers & Experienced Jobs | New Interview Questions | One Stop FAQs | One Stop GATE | One Stop GRE | One Stop IAS | One Stop MBA | One Stop SAP | One Stop Testing | Web Hosting in India | Free SMS | Quick Site Kit | Sirf Dosti | Source Codes World | Tasty Food | Tech Archive | Testing Interview Questions | Free Online Exam | The Galz | Fun & Entertainment | Vyom | Vyom eBooks | Vyom International | Vyom Links | Vyoms | Vyom World
    Page URL: http://www.onestopfaqs.com/faqs/209/Default.asp
    Download Yahoo Messenger | Placement Papers| FREE SMS | ASP .Net Tutorial | Greetings